TRANSPORTATION SECTOR:

The ADB project, “Loan 2817- INO, Study for the Services for the Indonesia Transport Sector Development Strategy and Policy, Regional Road Development Project (RRDP)”.MoNational Development Planning / National Development Planning Agency (BAPPENAS), / Asian Development Bank

(Over-seas project in Indonesia)

Responsible for working with the team to explore the relationship between transport and the Indonesia’s economy and how transport in Indonesia behaves in the economy, its contribution to the national GDP, and indication of transport investment needs for the next 5-10 years.

6

Sept. 2017

to

Mar. 2018

Completed
2The ADB project, “Contract no. 129608-S52937, TA 9153 PAK: Preparing MFF CAREC Railway Connectivity Investment Program – PPTA CS PPTA Consultant for PAK: Preparing MFF CAREC Railway Connectivity Investment Program (48416-001)”.Asian Development Bank & MoRailways, GoPak.Upgrading the Mainline-1 (ML-1) with 4 tranches: (i) tranche 1 for upgrading and dualization of rail track for Peshawar-Rawalpindi (173 km) including new signaling and telecommunications system (including power supply for these systems) and upgrading of passenger facilities in Peshawar and Rawalpindi stations.1Jan. 2017
to
Feb. 2017
Completed
3The ADB project, “Contract No. 119508-S84948 TA-8556 REG: Supporting the Cities Development Initiative for Asia – Pre-Feasibilty Study Sialkot (47285-001).”Asian Development Bank & Urban Unit, GoPunajbIdentify the traffic/transport and public space opportunities need to be developed and integrated into the MTIIP process with the possible inclusion for enhanced project development as part of the PFS phase of the work.1.5

June 2015

to

Mar.-2016

Completed.
4The ADB project, “Contract No. 119522-S84950: TA-8556 REG: Supporting the Cities Development Initiative for Asia – Pre-Feasibilty Study Sahiwal (47285-001).”Asian Development Bank & Urban Unit, GoPunajbIdentify the traffic/transport and public space opportunities need to be developed and integrated into the MTIIP process with the possible inclusion for enhanced project development as part of the PFS phase of the work.1.5June 2015
to
Mar.2016
Completed.
5“TA 46263-001 REG: Central Asia Regional Economic Cooperation (CAREC): Midterm Review of the Transport and Trade Facilitation Strategy and Implementation Action Plan”Asian Development BankCoordinating and participating of Mission in Pakistan, data collection and up-dates, write-ups on the road safety and international regional cooperation.10Nov. 2012
to
Sept-2013
Completed
6Responsible for the Traffic / Transportation Plan: G-5 (formerly Ocean Heights), Block-9, Scheme No. 5, Clifton; Karachi.Triple Tree Associates, KarachiOn-site Parking Plan and On and Off-site Traffic Circulation Plan. Aug. 2013
to
Oct. 2013
Completed
7Responsible for the traffic surveys, transportation planning and traffic study for the “Ocean Height” Project, Karachi.Triple Tree Associates, KarachiTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1June 2012
to
Oct. 2012
Completed
8Preparation of the Parking and Traffic Circulation Plans (Revision / Up-date) for the “Lucky One” (formerly Tabba Development) Project, Karachi.Tabba/Lucky Group / ARCOP.Undertook revision / up-date of the Parking and Traffic Circulation Plans as per the revised architectural plans and drawings.0.5Jan. 2012
to
June 2012
Completed
9Revision and up-date of the traffic forecasts and traffic capacity analysis as per new requirements for the “Ocean Tower” (formerly Sofetel Hotel) Project, Karachi.Triple Tree Associates, KarachiResponsible for the revision & up-date of the traffic & transportation planning and traffic study for the Mall. Also advise on the traffic signage and parking of the project.0.75April 2011
to
July 2011
Completed
10Revision and up-date of the traffic forecasts and traffic capacity analysis as per new requirements for the “Gulberg Galleria” (formerly Marriott Hotel) Project, Lahore.The Niaz Group, LahoreResponsible for the revision & up-date of the traffic & transportation planning and traffic study for the Gulberg Galleria.0.5Feb. 2011
to
March 2011
Completed
11Data Collection, Transport Model Implication Analysis and an Effect Analysis for the Lahore Case Study for the ADB funded, Sustainable Fuel Partnership (SFP) project. Other Cities Include Colombo, Kathmandu, Tbilisi, Guangdong Province in China and Beijing Shanghai High Speed Rail LinkPADECO Co., Ltd.; JapanFor the Asian Development Bank (ADB) funded project, responsible for the data collection and analysis of the transport sector in Lahore.0.5Jan. 2011
to
March 2011
Completed
12Responsible for the traffic surveys, transportation planning and traffic study for the Lahore City Centre (LCC), Project; DHA, Lahore.Lahore City Centre – DHA Ltd./ MGB International.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1.3Oct. 2009
to
May 2010
Completed
13World Bank Assisted Transport Policy and the Institutional Component of the Transport Studies of the Five Big Cities of Punjab. Services of Transportation Specialist provided to Dainchi Consultants Inc., Japan.The Urban Unit: P&D Department, GoPunjab.Urban Transport Policy/Planning Assessment. Urban Transport Institutional Assessment. Urban Transport Financing Assessment. Development of a draft Punjab Urban Transport Policy (PUTP) Development of an Institutional Realignment or Reform Plan (IRP). Public consultation.3Feb. 2007
to
May. 2009
Completed
14ADB assisted Sindh Road Sector Development Programme. Services provided as a Transport Planner / Traffic Engineer to Kampsax, Finnroad / ECIL, Karachi; Pakistan. (Under Sub-consultancy Agreement with the ECIL)Works & Services Deptt. GoSindhServices provided for the road safety and traffic engineering Reform Component Also did the Road Safety Audit of the numerous provincial roads.6July 2006
to
August 2007
Completed
15New Islamabad International Airport (NIIA)) facility, which is the first Green Field airport in Pakistan; spread out on 3,200 acres of land.

 

Services provided as a Transport Planner / Traffic Engineer to Louis Berger Group, USA / ECIL, Karachi; Pakistan. (Under Sub-consultancy Agreement with the ECIL)

CAA, GoPakistanLandside transportation forecasting, analysis and planning of the state of the art NIIA facility.2April 2006
to
May 2007
Completed
16Responsible for the traffic surveys, transportation planning and traffic study for the Hommie Katrack Chambers (HKC), Project, Karachi.HKC Limited / ARCOPTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1.3June 2008
to
April 2009
Completed
17Responsible for the traffic surveys, transportation planning and traffic study for the, “The Land Mark” Project, Karachi.Y-G Investment and Developers / ARCOPTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1.3June 2008
to
June 2009
Completed
18Responsible for the traffic surveys, transportation planning and traffic study for the Sofetel Tower – II Project, Karachi.Triple Holdings / ARCOPTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Feb. 2008
to
June 2009
Completed
19Responsible for the traffic surveys, transportation planning and traffic study for the Novotel Hotel Project, Lahore.EOBI / ARCOPTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Feb. 2008
to
April. 2009
Completed
20Responsible for the traffic surveys, transportation planning and traffic study for the Cube Centre Project, Karachi.Noor Automobiles (Pvt.) Ltd. / ARCOP.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Feb. 2008
to
June 2008
Completed
21Responsible for the traffic surveys, transportation planning and traffic study for the EFU Building Project, Karachi.EFU Life Insurance Co. / Habib Fida Ali & Associates.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Feb. 2008
to
July 2008
Completed
22Responsible for the traffic surveys, transportation planning and traffic study for the Pakistan Business Centre, Karachi.Askari – Sididqsons Development / Shankland Cox, UK.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Feb. 2008
to
Dec. 2008
Completed
23Transportation Planning and Traffic Study for the Tabba Development Project, Karachi.Tabba/Lucky Group / ARCOP.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.2April 2007
to
Aug. 2007
Completed
24Transportation Planning and Traffic Study for the Grand Hyatt Development Project, Islamabad.BNP Group / ARCOP.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.2March 2007
to
Aug. 2007
Completed
25Transportation Planning and Traffic Study for the High Rise Building (near Do Talwar) at Clifton; Karachi.Shaista EstatesTraffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Aug. 2007
to
Sept.2007
Completed
26Transportation Planning and Traffic Study for the Marriott Hotel Project, Lahore.Niaz Group / ARCOP.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.2Jan. 2007
to
May 2007
Completed
27Transportation Planning and Traffic Study for the Sofetel Hotel Project, Karachi in JV with ECIL.ARCOP.Traffic surveys, on-site parking plan, site lay-out plan, on-site and off-site traffic circulation plan.1Dec. 2006
to
Jan.2007
Completed
28As a Transportation Planner, advised the Karachi Port Trust to overall improve the productivity of the port and the city to make Karachi a global financial and transportation hub, through a series of projects.KPT, GoPakistanAdvised on their development works, such as KPT Flyover at Korangi, Development and Rehabilitation of Roads, namely from Mai Kolachi to Submarine Chowk, including underpasses and a fly-over, M. T. Khan Road from Jinnah Bridge to PIDC Bridge with a fly-over and M. A. Jinnah Road from Keamari to Jinnah Bridge including two fly-overs. Also advised on the future expansion plans and allied development works of the port, namely, cargo village, deep draft birth, Karachi Coastal Highway and water fountain projects.1May 2005
to
Jan. 2006
Completed
29

Study on Rapid Mass Transit System for Lahore. Services provided as a Senior Transport Planner to MVA, UK, Lahore; Pakistan. (Individual services provided)

Transport Deptt., GoPunjab

Worked on the project coordination, data collection and traffic data analysis and preparation of questionnaires. Did rapid appraisal of the various prospective mass transit corridors and prepared the traffic survey questionnaires along with detailed survey plans.

1Aug. 2005
to
Sept. 2005
Completed
30Pakistan Transport Sector Strategy.Asian Development Bank (ADB)Prepared the Pakistan Transport Sector, Strategy, covering all the modes of transport. The consultant held meetings with all the concerned stakeholders in Islamabad and the four provincial capitals. The consultant collected data from all the federal and the provincial departments and agencies, variety of organizations, NGOs, members of the civil society; and variety of donors. The diagnostic analysis was done through questionnaires and the data was collected from a wide range of sources. Also the traffic projections were made for all the transport sub-sectors.2Aug. 2000
to
Dec. 2001
Completed
31Institutional Alignment Study for Metropolitan Corporation Lahore’s (MCL) Roads Functions.Metropolitan Corporation Lahore (MCL)Prepared the Resource Generation part of the Institutional Alignment Study for Metropolitan Corporation Lahore’s (MCL) Roads Functions, a component of the World Bank funded Lahore Urban Transport Project (LUTP); in Joint Venture with the NESPAK and the Lahore University of Management Sciences (LUMS).2Jan. 1999
to
June 2000
Completed
32Environmental Risk Assessment for the ICI Paints Factory, Lahore. Identified vulnerable population groups, flora and fauna and infrastructure in the surrounding environment.ICI PakistanServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK.0.5Jan. 98
to
April 98
Completed
33Toll Study for the traffic forecasting and analysis, based on toll sensitivity analysis with varying tolls for the Commercial Feasibility of the nine motorways and expressways projects, with a total length of about 1,840 Km.; on the basis of BOT or Financing as a part of the national network plan for the National Highway Authority.National Highway AuthorityServices of Mr. Umar Farooq, Director P&DC as Advisor/Toll Expert/Economist provided to NESPAK.2.5June 1997
to
Nov. 97
Completed
34Concession Proposal for an Express Bus Business for an Improved Bus Service on the 334 km. Long Lahore-Islamabad Motorway; with a special Emphasis on the Inter-urban Public Transport in PakistanDaewoo Corporation, UK. & Seoul, KoreaServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK.2. 5March 97
to
June 97
Completed
35Commercial Feasibility Study of an Express Bus Service Operation for an Improved Bus Service on the 334 km. Long Lahore-Islamabad Motorway; with a special Emphasis on the Inter-urban Public Transport in PakistanDaewoo Corporation, UK. & Seoul, KoreaServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK.2.25Feb. 1997
to
April 1997
Completed
36Third Farm to Market Roads Project, Punjab North. The Asian Development Bank (ADB) funded ProjectGovt. of the Punjab, Communication & Works Deptt.Services of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Associated Consulting Engineers1.5Aug. 1996
to
Jan. 1997
Completed
37Out-line Commercial & Transportation Feasibility Study for the Islamabad Highway/Expressway ProjectGovt. of Pakistan, National Highway AuthorityServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK.0.75May 1996
to
May 1996
Completed
38Identified, Planned, Developed and Designed International Standard, 180 Traffic Direction and Management Signs for the Major Arterial roads of the City of LahoreTEPA, (L.D.A)Project Manager4Sept. 1995
to
Dec. 1995
Completed
39Traffic & Economic Feasibility of the Jahangira-Darband-Tahkot Highway, NWFPGovt. of Pakistan, National Highway AuthorityServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Khyber Consultants, Peshawar1Sept. 1995
to
Sept. 1995
Completed
40Promotion of Private Sector Participation in Highway Financing, Construction & Operation in Pakistan. ADB Technical Assistance (T.A.) ProjectGovt. of Pakistan, National Highway AuthorityServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, UK.1.25April 1995
to
June 1995
Completed
41Traffic and Economic Feasibility of the Sheikhupura Dera Ghazi Khan Section of the Motorway (M3)Govt. of Pakistan, National Highway AuthorityServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to BCEOM, Paris France6Oct. 1992
to
April 1993
Completed
42Pre-feasibility of the Lahore Light rail Project, World Bank funded StudyTEPA, (L.D.A)Services of Mr. Umar Farooq, Director P&DC as Transportation Planner2Oct. 1993
to
Nov. 1993
Completed
43Public Transportation Planning at the Lahore GTS Bus Stand and Railway Station AreaTEPA, (L.D.A) funded by the World BankServices of Mr. Umar Farooq, Director P&DC as Transportation Planner provided to Halcrow Fox, and Associates, UK.4April 1993
to
Oct. 1993
Completed

WATER SECTOR:

Sr.ProjectClientServicesDuration (Months)Project Start & Completion DatesStatus
1Working as an Advisor: Mechanical Engineering: Third Party Monitoring of the DPR Values Project. Taunsa Barrage Emergency Rehabilitation Project.Sukkur Barrage Rehabilitation Project.I&P Department, GoPunjabJoint Venture (Individual Services provided to the National Development Consultants).12Nov.2007 to July. 2008 Feb. 2004 to May 2007 Jan. 2004 to May 2005 (Broken period)Completed
2National Drainage Program – Sector Policy Studies (Package –1).Ministry of Water and Power, GoPakistanJoint Venture6May 2000
to
Nov. 2003
Completed
3Study for Protection of High-pressure Pipelines of SNGPL Crossing River Sutlej U/S of Panjnad Headworks.Sui Northern Gas Pipelines, GoPakistanPlanning & Development Consultants (Pvt.) Ltd.3Nov. 2001
to
Jan. 2002
Completed
4Evaluation of Safety of Major Irrigation Installations / Structures in Dera Ghazi Khan Zone.Irrigation & Power Department Gov. of The PunjabPlanning & Development Consultants (Pvt.) Ltd.7Dec. 1997
to
June 1999
Completed
5Study for Development of Irrigation Uses in Punjab Due to Water Accord.Govt. of the Punjab, Irrigation & Power Deptt.Joint Venture12July 1996
to
Oct. 1997
Completed
6Punjab Privatization of Ground Water Development.Govt. of the Punjab, Planning & Development Deptt.Services of Mr. Khalid Faruq, Director P&DC as Project Coordinator provided to Associated Consulting Engineers3July 1995
to
Oct. 1995
Completed
7National Study on Reducing Government Liability Effective, Performance of Irrigation Departments and Use of Abiana for Increasing farm Outputs.Ministry of Water and Power Govt. of Pakistan; funded by the World bankJoint Venture24Oct. 1992
to
Oct. 1994
Completed
8National Study for Improving Procedures for Assessment and Collection of Water Charges and Drainage Cess.Ministry of Water and Power Govt. of Pakistan; funded by the World bankJoint Venture10July 1989
to
April 1990
Completed
9National Plan for Water Resources Research 1991- 2000.Pakistan Council for Research in Water ResourcesPrepared the Research Agenda1May 1991
to
July 1991
Completed
10Proposal formulation in Pakistan Water Sector Investment Planning Study (In association with NEDCO & DELFT).Planning CommissionFeasibility1Nov. 1988
to
Dec. 1988
Completed
11River Hydraulic data observation and compilation of barrages in the Province of Punjab.HalcrowProvided the technical services1June 1995
to
August 1995
Completed
12Restoration and Maintenance of the Major Irrigation Installations / Structures, “RD 13-BSL” including Flood Protections and Canal Embankments in Lahore Irrigation Zone.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.5Dec. 1998
to
April 99
Completed
13Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 271+152 MBL” including Flood Protections and Canal Embankments in Lahore Irrigation Zone.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.5Dec. 1998
to
April 1999
Completed
14Restoration and Maintenance of the Major Irrigation Installations / Structures, “ Drainage Syphon RD 424+750 BRBD Link Canal” including Flood Protections and Canal Embankments in Lahore Irrigation Zone.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.5Dec. 1998
to
April 1999
Completed
15Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 433+958 BRBD Link Canal” adding impervious floor, Flood Protection and Canal Embankment.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.3Dec. 1998
to
Feb. 1999
Completed
16Restoration and Maintenance of the Major Irrigation Installations / Structures, “Syphon RD 52+200 MLU UCC” including Flood Protections and Canal Embankments.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.2Dec. 1998
to
Jan. 1999
Completed
17Restoration and Maintenance of the Major Irrigation Installations / Structures, “ RD 63+450 MLU UCC” including Flood Protections and Canal Embankments.Irrigation & Power Department Gov. of the PunjabPlanning & Development Consultants (Pvt.) Ltd.2Dec. 1998
to
Jan. 1999
Completed

URBAN PLANNING SECTOR & OTHER PROJECTS:

Sr.ProjectClientServicesDuration (Months)Project Start & Completion DatesStatus
1Punjab Co-operative Housing Society.The Punjab Co-operative Housing SocietySurvey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents7Jan. 1992
to
Aug. 1992
Completed
2Punjab Industrial Estate.Chohan Consultants (Pvt.) Ltd.Survey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents7May 1994
to
Nov. 1994
Completed
3External Electrification of Shalimar Housing Scheme.Shalimar Housing SocietySurvey, Planning and Detailed Engineering Designing, including BOQs & Tender Documents6Jan. 1994
to
June. 1994
Completed
4Study of the procedure for the award of contracts and selection of contractors for the National Highway Board.Ministry of Communication, Govt. of PakistanProcedural Study2Feb. 1988
to
March. 1988
Completed